+86 138 8989 9165soniaw@126.comJournalWhite papers & resources
ARCHORABuilding with Confidence, Protecting the Future.
Physical coating finish sample · texture reference
Physical coating finish sample · texture reference

Alkali-Resistant Sealing Primer

A supporting primer used before the specified wall coating finish.

Product codeKY-1060
ApplicationWall coating preparation

Before specifying

Match the primer to the substrate and the selected finish; confirm preparation requirements.

Confirm the substrate, exposure conditions, coating system and current product documents before specifying a product.

Technical data

PropertyValueTest method / conditionsDocument basis
Surface-dry time (alkali-resistant sealer)1 hGB/T 9755-2014, Table 1, exterior primer type IIBETC-HJ-2024-P-00255 / 2024-04-24
Alkali resistance (alkali-resistant sealer)No abnormality after 48 hGB/T 9755-2014, Table 1, exterior primer type IIBETC-HJ-2024-P-00255 / 2024-04-24
Water resistance (alkali-resistant sealer)No abnormality after 96 hGB/T 9755-2014, Table 1, exterior primer type IIBETC-HJ-2024-P-00255 / 2024-04-24
Water permeability (alkali-resistant sealer)0.5 mLGB/T 9755-2014, Table 1, exterior primer type IIBETC-HJ-2024-P-00255 / 2024-04-24
Efflorescence resistance (alkali-resistant sealer)No abnormality after 48 hGB/T 9755-2014, Table 1, exterior primer type IIBETC-HJ-2024-P-00255 / 2024-04-24
Surface-dry time (anti-fungal variant)<2 hGB/T 1728-1979(1989)TL226-240939 / 2024-07-02
Fungal resistance (anti-fungal variant)0 gradeGB/T 1741-2007, 28-day culture-dish methodTL226-240939 / 2024-07-02
Water permeability (anti-fungal variant)0.3 mLJG/T 210-2018TL226-240939 / 2024-07-02
Efflorescence resistance (anti-fungal variant)No abnormality after 120 hJG/T 210-2018TL226-240939 / 2024-07-02

Original reports may show the manufacturer's other brand name. The company confirms that the corresponding ARCHORA products use the same formulation and specifications.

Manufacturer's manual data is not an independent test report. Reported results apply to the submitted sample and stated test conditions; they do not establish performance on every job site or constitute international certification.

Application & system

PropertyValueTest method / conditionsDocument basis
Theoretical coverage / consumption0.10–0.15 kg/m²Source documentManual V3 2026-07-09
Recommended coats1 coatSource documentManual V3 2026-07-09
Application methodBrush, roller or spraySource documentManual V3 2026-07-09
Application temperature5–35 °CSource documentManual V3 2026-07-09
Relative humidity≤85 %Source documentManual V3 2026-07-09
Recoat / clear-coat intervalAllow to dry fully; typically 4–12 h depending on weatherSource documentManual V3 2026-07-09

Confirm the full system for the substrate and project conditions. A protective topcoat is not required for every product.

Coating systems

Documents

Product bulletin / TDS

Product properties, uses, application conditions and storage instructions.

Safety data sheet (SDS)

Hazards, handling, protective measures and other safety information.

Test report

Results for the submitted sample under the stated test conditions.

Download data summary (CSV)

Website data summary; not a formally issued TDS.

Contact us to confirm the latest TDS and any data not listed here.